This standard specifies the requirements of the materials, technical requirements, inspection, packaging,labeling, transportation and storage in the process of manufacturing transmission line tower (hereinafter referred to as \
Foreword 1 Scope 2 Normative references 3 Terms and definitions, symbols 3.1 Terms and definitions 3.2 Symbols 4 General provisions 5 Materials 5.1 Steel 5.2 Welding consumables 5.3 Fasteners 5.4 Zinc ingots 6 Technical requirements 6.1 Cutting 6.2 Identification 6.3 Bending 6.4 Making hole 6.5 Arc shoveled, chip heel and grooving 6.6 Welding 6.7 The weldment assembly 6.8 Adjusting 6.9 Hot-dip galvanizing 6.10 Trial assembling 7 Inspection 7,1 Certificate 7.2 Inspection items 7.3 Inspection requirements and methods 7.4 Sampling plan andjudging rules 8 Packaging, labeling,transportation and storage 8.1 General requirements ofpackaging 8.2 Labeling 8.3 Transportation and storage Annex A (normative) Uniformity ofhot-dip galvanized coating Test methods by copper sulfate Annex B (normative) Adhesion of hot-dip galvanized coating Test method by drop hammer Annex C (normative) Thickness ofhot-dip galvanized coating Test method by metal coating thickness gauge Annex D (normative) Adhesion amount of hot-dip galvanized coating Test method by dissolved weighing Annex E (normative) Adhesion amount and uniformity of hot-dip galvanized coating The method for preparation of the sample Annex F (informative) Surface colors and their corresponding temperatures of steel